STATE ENTERPRISES’ INVESTMENT PROGRAMME 2014
23
SUSTAINING GROWTH, SECURING PROSPERITY
2013 is $0.97 million. The 9000 bbl Gasoil
tank in Tobago was completed in fiscal 2013
at an estimated cost of $4.6 million.
•
Salt and Fresh Water Fire Pump System
–
The existing salt water and fresh water pumps
are to be replaced at a total estimated cost
of $3.4 million. These new installations are
to ensure an uninterrupted source of water
for fire-fighting at NP’s compound in Sea
Lots. The projected expenditure for April to
September 2013 is $1.1 million while for fiscal
2014 is $2.3 million. This project is expected
to be completed by the second quarter of
fiscal 2014.
•
Fire Engine with Pump at Piarco (Fire
water system)
– This project involves an
overhaul of the fire control system at Piarco
to increase coverage of a sprinkler system
and to increase overall fire water storage
capacity. The estimated cost of the project
is $2.0 million. The projected costs for April
to September 2013 and fiscal 2014 are $0.5
million, respectively.
•
Installation of Automatic Transfer Switch
(ATS) and Power Upgrade at NP
– The
ATS will replace the existing switch which is
obsolete and inoperable. This is expected
to mitigate the risk associated with manual
switching when the utility power supply to the
Sea Lots Complex is interrupted. The upgrade
to medium voltage power system is based
on the Electrical Inspectorate requirements.
The estimated cost for both projects is $4.0
million with projected expenditure for April
to September 2013 at approximately $2.3
million and for fiscal 2014 is $1.0 million.
•
Multi Fuelling Facility at Caroni (Diesel)
–
This will be used as a fuelling facility to service
NP’s Road Tank Wagons (RTW’s) with diesel
at the new base in Caroni. This project will
increase the efficiency of fuel supplied to
NP Service Stations throughout Trinidad.
The project is estimated to cost $3.0 million.
Projected expenditure for April to September
2013 is $1.0 million and for fiscal 2014 is $1.0
million.
•
Acquisition of LPG Cylinders and Valves
– NP is expected to acquire 60,000 20lbs
and 30,000 100lbs cylinders at an estimated
cost of $23.0 million by September 2013. NP
further proposes to acquire another 180,000
20lbs and 30,000 100lbs cylinders at an
estimated cost of $11.1 million. Expenditure
for cylinders for April to September 2013 is
projected at $5.7 million and for fiscal 2014
the projection is $5.7 million. The acquisition
of cylinder valves was based on the results of
testing plants and is estimated to cost $1.8
million.
•
Upgrade of LPG Filling Plants at Natpet
(Sea Lots) and Tobago
– The upgrade of
both plants will improve the accessibility and
supply of LPG nationwide. The estimated
cost of the plants at Natpet and Tobago is
$4.9 million and $6.0 million respectively.
Projected expenditure for the period April to
September 2013 for the Tobago plant is $1.0
million and $2.5 million is projected for the
Natpet Plant. The projected expenditure for
fiscal 2014 for both plants is $3.5 million.
•
5000 BBL Static Water Tank Piping
–
The objective of this project is to ensure the
fire-fighting system in Piarco complies with
the NFPA codes for fuelling terminals. The
estimated cost is $4.0 million with projected
expenditure of $2.0 million for April to
September 2013 and $2.0 million for fiscal
2014.